Road construction
Nordecon has been active in road construction since 1990, and this includes main contracting, designing and project management.
During these years we have laid different types of covers on roads (I-V class), parking lots, ports, airports, stadiums and squares all over Estonia and abroad. Based on this experience our engineers find the best solutions to all wishes and problems. The company provides full solutions with its own staff starting from idea, design and construction and ending with the procedures needed to obtain authorisation for use.
In the framework of the general contracting project of Mäo intersection completed in 2010 as the first and so far biggest design and construction contract in Estonia, Nordecon re-built the Tallinn-Tartu-Võru-Luhamaa road at the Mäo intersection as a 1st class two-way road with two lanes both ways and with a dividing strip, three cross-roads which are grade separated, access roads and squares in the new Mäo centre and light-traffic roads with a length of 4.5 km.
During 2011-2013 Nordecon will prepare a design for the E263 Tallinn-Tartu-Võru-Luhamaa road 13.05 km-long Aruvalla-Kose road section with 2+2 lanes and a separation zone with intersections consisting of grade-separated junctions, including carriageways and light-traffic roads meeting the requirements of a class I road and will execute the construction work thereof.
During the same time period Nordecon will reconstruct the Luige junction based on the design solution provided by the Client. During the construction process of the Luige grade-separated junction a 2.7 km-long section of the Tallinn Roundabout on main road no. 11 will be re-constructed as a road with 2+2 lanes meeting the requirements of a class I road. Within this section the existing 1+1 lane road section will be connected to a 2+2 lane road to be constructed on both ends. Two circular intersections will be constructed that are meant to replace the existing junctions with the Tallinn Roundabout and Tallinn-Rapla-Türi support road. Also carriageways and light traffic ways will be built. The project includes construction of one road overpass and one light traffic overpass.
For performing work Nordecon uses the most modern machinery which is equipped with laser and GPS technology, ensuring rapid completion of processes with high quality.
Further information:
- Head of road construction and production division Ain Pähkel, e-mail: ain.pahkel@nordecon.com,
phone +372 527 3949
Nordecon to increase its Q1 sales revenue by 20% year-over-year
09. may 2013The sales revenue of Nordecon AS amounted to €27.1 million in the 1st quarter of 2013, which is 20% more than in the same period the year before. The Group’s gross profit in the 1st quarter was €593,000, increasing by more than half a million euros compared to the quarter a year ago.
Nordecon to deliver a completed commercial building to the client in the Rotermanni Quarter
29. april 2013Today, Nordecon AS delivered the completed commercial and residential building at the address Rotermanni 10 in the Tallinn City Centre to Rotermanni City OÜ, a company engaged in developing the Rotermanni Quarter. The construction of the commercial building with guest apartments lasted 12 months.
Notice of annual general meeting of shareholders
29. april 2013The management board of Nordecon AS (registry code 10099962, address Pärnu mnt 158/1, 11317 Tallinn) summons an annual general meeting of shareholders, which shall be held on 24 May 2013 at 10.00 a.m. in the conference centre of Radisson Blu Hotel Olümpia, room Beta (Liivalaia 33, 10118 Tallinn).
Nordecon enter into a contract for reconstruction of the water treatment plant in Paide
11. april 2013Nordecon enter into a contract with AS Paide Vesi for reconstruction of the water treatment plant in Paide. The total value of the work with the reserve of the contracting entity is 6.74 million euros exclusive of VAT.