Back to list

Engineering - External utility lines and water treatment

Kadrina wastewater treatment plant

  • Customer

    Kadrina Soojus AS

  • End of works

    2012

The pollution load to the wastewater treatment plant is 3 280 PE and the plant capacity is Qavr=432 m³/d and Qmax=518 m³/d.

  • Ref
  • Ref
  • Ref